Choisissez la matière et le coloris d’origine pour ce sac. La demande de stock reste disponible ci-dessous.
AI-generated Lettning Ang custom-hardware concept. Existing stock hardware is not represented; confirm feasibility and approve a sample before ordering.
← Retour aux modèles en stockHY-010 · PU shoulder bag
Oval-handle PU chain bag
Compact PU bag with oval handles and a chain strap. LA custom-hardware concept · Sample approval required.
AI-generated Lettning Ang custom-hardware concept. Existing stock hardware is not represented; confirm feasibility and approve a sample before ordering.
Colour / Mocha brown
- Material
- PU
- Branding
- Custom logo available
- Sample lead time
- 7–10 days
- Production lead time
- 30–45 days
Colour names are provisional. AI styling images are illustrative and do not establish product dimensions.
LA customization concept

Product information
The details that matter.
- Style number
- HY-010
- Material
- PU
- Visible surface finish
- Suede-look PU panels with smooth PU trim
- Colours shown
- Mocha brown / Birch green / Chocolate brown
- Dimensions & strap length
- 25 × 8 × 17 cm · Dimensions as labelled in the supplied photo; axis order and strap length to be confirmed.
- Availability
- HY series · In-stock styles. Confirm colour availability, quantity and dispatch timing with your enquiry.
Colour selection
See it styled.
AI styling illustrations. Refer to confirmed measurements for actual size.



From selection to production
Start with your requirements.
01. Share your selection
Choose colours and quantities, and tell us whether you need your logo.
02. Discuss your sample
Confirm the quotation and sampling details. Sample lead time: 7–10 days.
03. Plan production
Confirm the order requirements and schedule. Production lead time: 30–45 days.
Can I add my logo or request a sample?
Custom logos are available. Logo method, placement and charges are confirmed with your requirements. Select “Sample enquiry” in the form to discuss sample availability and fees.
How are lead times calculated?
Sample lead time is 7–10 days; production lead time is 30–45 days. The starting point, calendar-day or working-day basis, and shipping schedule require confirmation with your quotation.
Your next step
Make it part of
your collection.
Share your colours, quantity and branding needs to prepare a focused enquiry.
HY-010 · PU
Review your enquiry, then choose email or WhatsApp.
Your enquiry draft
Check the details, then choose how to contact us.